Equipment and wiring installation

  •  Change of control panels or installation.
  • Infrared sensors and manual push button installation.
  • Connections and internal installations in boards.
  • Wiring and cable routing.
Cuartos de control
Cableado y Ruteo
 

Control wiring boards

  • Control board change.
  • Relocating Panel View.
  • Smart EYC readers relocation.
  • Network cabling (Rio-Ethernet).
  • Relocated PLC SLC.
  • Armed control panel.
  • Relocating QLT Production System screen.
  • Relocation of start/ stop push button
Tableros
Cableado